- Home
About Us
Our Approach
Sustainability
Key Services
CPDs
Work For Us
- Downloads
- News
Products & Services
Our Work
Fit Out Projects
Sectors
- Inspiration Gallery
Contact Us
LAKESIDE
HOUSE
Sector
Commercial
Architect
tp bennett
Contractor
Oakmont
Location
Stockley Business Park, Uxbridge
PROJECT OBJECTIVES.
Client Tritax
The construction project at the 72,000 ft2 commercial office building at Stockley Park, Uxbridge, involved a total strip back to frame of the entire internal structure to facilitate a reinvention of the lakeside property.
Part of this reconfiguration work involved a full removal of the internal atrium glazing, including structural alteration and the additions of a new feature wall and stairs.
![36A8890](/assets/Content-Images/Lakeside-House/36A8890__FillWzYwMCw2MDBd.jpg)
![36A9089](/assets/Content-Images/Lakeside-House/36A9089__FillWzYwMCw2MDBd.jpg)
Project insights.
The work on the property at Stockley Park was completed to meet a very high standard of sustainability requirements; as well as targeting a BREEAM minimum score of ‘Very Good’, the building in its entirety has been designated as fully Carbon Neutral Capable.
Radii AG’s commitment to responsible construction and waste management as part of our group’s Net Zero Carbon strategy ensures that, for any work we undertake, we will provide a positive contribution to achieving a project’s sustainability targets.
Image credit: Oakmont Construction Limited
Project
highlights
Scroll
![36A8890](/assets/Content-Images/Lakeside-House/36A8890__FillWzYwMCw2MDBd.jpg)
![36A8988](/assets/Content-Images/Lakeside-House/36A8988__FillWzYwMCw2MDBd.jpg)
![36A9031](/assets/Content-Images/Lakeside-House/36A9031__FillWzYwMCw2MDBd.jpg)
![36A9047](/assets/Content-Images/Lakeside-House/36A9047__FillWzYwMCw2MDBd.jpg)
![36A9089](/assets/Content-Images/Lakeside-House/36A9089__FillWzYwMCw2MDBd.jpg)
![36A9388](/assets/Content-Images/Lakeside-House/36A9388__FillWzYwMCw2MDBd.jpg)