- Home
About Us
Products & Services
Our Work
Fit Out Projects
Sectors
- Inspiration Gallery
Contact Us
HOLLAND
PARK
SCHOOL
Architect
Aedas
Contractor
Shepherd Construction
Location
London
PROJECT. OBJECTIVES
Client The Royal Borough of Kensington and Chelsea
Located between Kensington and Notting Hill, Holland Park School is seen as one of the best state schools in London. However, one of the biggest threats to it's reputation was the condition of the older buildings, so the school decided to consolidate all the existing school buildings and facilities into a brand new purpose built structure. Radii AG put forward a proposal for all interior glazing and partitioning, including the atrium, classrooms, library, sixth-form areas, gymnasium and doors. On confirmation of costs, primary contractor Shepherd Construction commissioned Radii AG to undertake the interior glazing installation project for this highly prestigious project.
![Radii AG Holland Park School Case Study 1](/assets/Content-Images/Holland-Park-School/Radii-AG-Holland-Park-School-Case-Study-1__FillWzYwMCw2MDBd.jpg)
![Radii AG Holland Park School Case Study 8](/assets/Content-Images/Holland-Park-School/Radii-AG-Holland-Park-School-Case-Study-8__FillWzYwMCw2MDBd.jpg)
Project insights.
One of the key challenges was bolting the atrium glazing to the steel work. So Aedas created a seamless and minimal look and feel by using stainless steel bolts, which meant that each piece of glass and bolt position had to be millimetre perfect.
Radii AG's in-house design team engineered a clever solution to achieve this and as a result, the glass in the atrium ensures the extensive new facilities are visible and accessible, with learning on show.
Project
highlights
Scroll
![Radii AG Holland Park School Case Study 1](/assets/Content-Images/Holland-Park-School/Radii-AG-Holland-Park-School-Case-Study-1__FillWzYwMCw2MDBd.jpg)
![Radii AG Holland Park School Case Study 2](/assets/Content-Images/Holland-Park-School/Radii-AG-Holland-Park-School-Case-Study-2__FillWzYwMCw2MDBd.jpg)
![Radii AG Holland Park School Case Study 3](/assets/Content-Images/Holland-Park-School/Radii-AG-Holland-Park-School-Case-Study-3__FillWzYwMCw2MDBd.jpg)
![Radii AG Holland Park School Case Study 4](/assets/Content-Images/Holland-Park-School/Radii-AG-Holland-Park-School-Case-Study-4__FillWzYwMCw2MDBd.jpg)
![Radii AG Holland Park School Case Study 5](/assets/Content-Images/Holland-Park-School/Radii-AG-Holland-Park-School-Case-Study-5__FillWzYwMCw2MDBd.jpg)
![Radii AG Holland Park School Case Study 6](/assets/Content-Images/Holland-Park-School/Radii-AG-Holland-Park-School-Case-Study-6__FillWzYwMCw2MDBd.jpg)
![Radii AG Holland Park School Case Study 7](/assets/Content-Images/Holland-Park-School/Radii-AG-Holland-Park-School-Case-Study-7__FillWzYwMCw2MDBd.jpg)
![Radii AG Holland Park School Case Study 8](/assets/Content-Images/Holland-Park-School/Radii-AG-Holland-Park-School-Case-Study-8__FillWzYwMCw2MDBd.jpg)
![Radii AG Holland Park School Case Study](/assets/Content-Images/Holland-Park-School/Radii-AG-Holland-Park-School-Case-Study__FillWzYwMCw2MDBd.jpg)